ABA Crane Hire delivered a complex chiller replacement at Spectrum Point in Farnborough, involving the removal of an existing unit and installation of a new 4,000kg chiller.
The project was completed under full contract lift conditions using a Liebherr LTM1110 mobile crane, operating at a 26-metre radius.