All Projects

Commercial • Farnborough, Hampshire • Contract Lift / Lift & Shift

Spectrum Point, Farnborough – Chiller Replacement

Project Overview

ABA Crane Hire delivered a complex chiller replacement at Spectrum Point in Farnborough, involving the removal of an existing unit and installation of a new 4,000kg chiller.

The project was completed under full contract lift conditions using a Liebherr LTM1110 mobile crane, operating at a 26-metre radius.

With a suspended multi-storey car park, underground parking and strict structural loading requirements, the operation demanded detailed planning and careful coordination.

The Challenge

Working within a structurally sensitive environment presented several challenges, including restricted axle loads, suspended concrete structures and the need to protect the underground parking areas below.

The project required engineered propping, 3D surveying and Network Rail approval before lifting operations could proceed.

Every stage needed to be carefully assessed to ensure the crane could operate safely within the site's structural and access limitations.

Our Solution

ABA delivered a fully managed contract lift using a Liebherr LTM1110 mobile crane.

The operation incorporated detailed lift planning, structural load considerations, engineered propping and 3D surveying to establish a safe lifting configuration.

With the necessary approvals in place, the team coordinated the removal of the existing chiller and installation of the new 4,000kg unit at a 26-metre working radius.

The Outcome

The chiller replacement was successfully completed, with both removal and installation operations delivered safely under controlled lifting conditions.

The project demonstrated ABA's ability to manage technically demanding lifting operations where structural restrictions, specialist engineering requirements and third-party approvals require careful coordination.

Key Elements

  • Fully managed contract lift operation
  • Removal and replacement of a 4,000kg chiller
  • Liebherr LTM1110 mobile crane
  • Lifting operations at a 26-metre radius
  • Structural axle load assessments and restrictions
  • Engineered propping to accommodate loading requirements
  • 3D surveying to support lift planning
  • Network Rail approval and site coordination

Why Spectrum Point Chose ABA

  • Proven experience in complex commercial lifting operations
  • Full contract lift management, from planning to execution
  • Expertise in lifting within structurally restricted environments
  • Ability to coordinate engineering assessments and third-party approvals
  • Specialist crane selection and lifting configuration planning
  • Safe, controlled delivery of technically challenging projects